Hi all,
I am currently working on this '66 frame. I has been raked to about 37-38 degrees. Look although it was cut/wedged and re welded as you can see in the following pics. Has anyone on here had the joy of going through this same procedure?
I plan to set it up in a friends frame jig. Recut the same line that was cut before, then slowly remove material till we get the desired 30degree.
If anyone has any input or experience on this topic, i'm all ears.
Thanks,
James